Transportation and infrastructure The real challenge is no longer whether to invest.

This is mBolden's outlook for leaders of transportation and infrastructure organizations. It explains how leaders can turn investment into roads, rail and ports that keep performing: get more from the networks they have, choose projects better, use digital tools and coordinate across agencies.

Industry outlook12 min read

Executive Summary

Transportation and infrastructure sit at the centre of economic life. The roads, rail, and ports that these organizations operate carry the goods and people that every other sector relies on, mostly without anyone noticing until they stop. For most of the past century the work was to extend that network, but the pressure now is different. Demand is still rising and the network is still growing, but the assets built decades ago are aging. What is asked of the organizations that run them keeps widening.

For years the debate in the sector was about money, and whether enough of it could be found to meet the need. That debate has not ended, but it has shifted ground. The question that now decides outcomes is whether an organization can turn investment into performance, and the distance between the two is wider than it first appears. Money committed to infrastructure is not the same as infrastructure delivered, and infrastructure delivered is not yet infrastructure that goes on performing, year after year, under load.

The scale of the need is well established. A 2017 study for the G20 estimated that the world needs to invest $94 trillion in infrastructure between 2016 and 2040, about $3.7 trillion a year, or $97 trillion once the UN goals for clean water and electricity are included. On current spending trends, almost 19 percent of that total would go unfunded.1 Closing that gap will take more capital, and it will take better use of the capital already in motion. The sector has room to improve on the second count, and the returns from doing so are large enough to change the economics of the whole program.

Current Challenges: Funding Gaps, Delivery Constraints, and Uneven Performance Across Networks

The constraint that binds the transportation sector is execution. The needs are large and well documented, and the strategies to meet them are mostly in hand; what slows delivery sits elsewhere. Funding arrives unevenly, and logistics performance varies from one market to the next. Projects run on cycles long enough that the conditions they were planned for have changed by the time they finish, and reliability is expected to improve without leaning any harder on users or public budgets than either can carry.

1. Delivery productivity has long been the sector’s weak point

Much of the available productivity goes unclaimed. Research published in 2013 estimated that practical steps could cut infrastructure spending by 40 percent, about $1 trillion a year, through three levers: choosing projects better, streamlining delivery, and getting more from what already exists.2 The improvements are not hypothetical. They are available to any organization prepared to build the discipline to claim them.

Few organizations work this way, and the reasons recur from one program to the next. Projects are chosen for their visibility as much as for their fit with strategy. Planning at the front end gets compressed to meet a date, and the cost of that compression arrives later, as overruns and delay. Procurement leans toward what is familiar rather than what performs. And once an asset is built, the discipline needed to keep it performing tends to give way to the next thing being built.

2. Logistics performance varies sharply between markets, and the weakest fall further behind

The World Bank’s 2023 Logistics Performance Index, covering 139 countries, measures how readily a country can form reliable supply-chain connections, along with the conditions that make those connections possible: the quality of its logistics services, its trade and transport infrastructure, the performance of its customs and border agencies.3

The more telling finding concerns where time is lost. While most time is spent in shipping, the biggest delays happen at the interfaces: in the seaports, airports, and multimodal facilities where one system hands off to another.3

That finding moves the problem. For a long time, the response to a transport bottleneck was to build more transport. The interface data points to coordination between modes and operators as the constraint, and coordination is not something that more concrete resolves.

3. Recent disruptions have shown how little resilience the system was built to hold

The 2023 index came after three years of unprecedented supply chain disruption during the COVID-19 pandemic, when delivery times soared.3 That period showed how quickly a single disruption now travels through supply chains that had been built for cost and never for shock.

The reaction across governments and operators has been to reopen a trade-off the sector had long treated as settled, and to invest again in the redundancy it had spent years removing.

The case for investing in transportation and infrastructure is not weakening. On nearly every mode it is growing stronger, and the tools for raising asset performance and coordinating networks have caught up with the ambition. What was a pilot five years ago is now something an organization can deploy at scale, which changes what the sector can reasonably expect of itself.

1. Freight demand is set to grow through 2050

By 2050, passenger demand rises 79 percent and freight demand roughly doubles if current policies hold; with more ambitious climate policies, the increases are 65 and 59 percent.4

Maritime shipping carried about three-quarters of freight moved outside cities in 2019, measured by weight times distance.4 As supply chains are rebuilt for resilience, the handoffs between modes become more important.

The implication for policy follows directly.

Decisions taken now will set network capacity for decades, and getting them right calls for a steadiness of analysis and planning that delivery organizations have often struggled to hold across the life of a program.

2. Digitalization has become more practical, and more valuable, across the sector

End-to-end supply-chain digitalization, especially in emerging economies, is letting some countries cut port delays by up to 70 percent compared with developed countries.3 The number is best read as the distance between organizations that have invested in data exchange, automation, and analytics and those that have not.

The gap is one of execution rather than access. More than 80 percent of global trade by volume moves by sea, and AI is working its way into how that trade is run: real-time visibility into where a vessel is and when it will arrive allows closer coordination with land-side logistics.5 Dynamic routing lets operators hold to their delivery commitments, carry less inventory, and reroute around congestion as it forms rather than after it has taken hold.

Most technology programs get this backwards. Digitalization is not first a technology investment. It is an investment in the organization and its governance. The value goes to those who redesign their processes and decision rights to use better information, not to those who add new tools to the way they already worked and wait for the tools to do the rest.

3. Green logistics has crossed from preference into procurement requirement

Demand for green logistics has become a condition of doing business: in 2023, 75 percent of shippers were looking for environmentally friendly options when exporting to high-income countries.3 What began as a statement of values has become a line in the contract. Operators and asset owners that can’t show progress on decarbonization will feel the pressure first from the customers and counterparties that set procurement standards, well before any regulator reaches them. The transition carries a real cost in the investment it demands, and it hands an advantage to whoever moves early and builds the capability ahead of the requirement.

Opportunities and Solutions: Better Project Selection, Disciplined Delivery, and Stronger Asset Performance

The near-term priorities for transportation and infrastructure leaders are not new, and that is the point. They have been identified, consistently, across more than a decade of evidence. The constraint is finding the discipline to do it when the incentives point the other way.

1. Get more from existing networks before defaulting to new build

Choosing the right projects and cutting the wasteful ones could save around $200 billion a year worldwide.2 For most organizations the highest return lies not in a new asset but in an existing one made to work better. Maintenance backlogs, underused capacity, and poor information about the assets themselves are common everywhere, and closing the performance gap on what is already in the ground tends to beat new construction on return, at lower risk and over a shorter period.

This asks for a discipline most infrastructure organizations have not developed. A new build is visible, can be funded, and runs to a finish line. But asset optimization has none of those qualities. It is operational, draws little attention, and is never quite finished, which is why it loses the contest for priority even where it wins the contest on economics. The economics ought to prevail more often than they do.

2. Invest in project selection and early‑stage planning

One of the largest sources of savings in delivery is spending more at the front end, not less. Compressed early planning is among the most reliable predictors of cost overrun and schedule slip across the field. Organizations that take the time to define scope, settle decision rights, and resolve design questions before construction begins tend to come out ahead of those that do not, on cost, on schedule, and on the quality of what is built.

Some of the fastest gains come not through new technology or new money, but from clarifying who decides what, aligning processes across agencies, and measuring performance. Those improvements are often available all along, waiting behind a governance problem that no one has yet chosen to solve.

3. Use digital tools to lift asset productivity and network coordination

Digital investment in this sector pays off most clearly when it is tied to a particular operational outcome: a shorter dwell time at a port, maintenance scheduled by predictive analytics, freight routed on live network data, a view held across a corridor rather than lost at its seams. Put that concretely, the case makes itself. Put as a transformation program, it tends to dissolve.

The tools can streamline operations and improve the exchange of data, and the links they build into inland rail and road networks are what carry goods cleanly from a port to where they are actually going. The value, though, does not come from the technology. It comes from redesigning the work and the decision rights around better information, with the technology serving as the condition that makes it possible rather than the project itself. Organizations that treat these as changes to the operating model capture the return. Those that treat them as technology projects mostly do not.

4. Strengthen coordination along corridors, across modes and agencies

Some of the largest performance gaps in a network sit not within any single mode or organization but in the spaces between them. A multimodal corridor depends on coordination among operators and agencies that answer to no shared authority, and that coordination rarely happens on its own. It has to be designed and given explicit governance, along with a forum that has the standing to resolve conflict and align priorities across organizational lines.

Public-private partnerships can carry modernization forward where the risk is sensibly allocated and the governance is built with care. The evidence on private participation is consistent on the point that matters: value depends far less on the financing structure than on the quality of the governance, procurement, and execution capability assembled around it.

Conclusion: Winning Organizations Will Modernize Operations Before Expanding Capacity

Transportation and infrastructure are moving toward an operating model that is more integrated, more data-enabled, and more deliberately built for resilience. The demand growth is real, the investment need is established, and the direction is not in doubt.

What remains uncertain, for most organizations, is how to make the transition without giving up the reliability and affordability that customers and regulators still expect while it is under way. That is the delivery problem, and it is where execution capability stops being a phrase and becomes the thing that separates the organizations that create lasting value from those that only spend.

The first type aligns capital strategy with the capacity to deliver, folds digital tools into daily operations instead of piloting them at the edges, and keeps service steady while the system reorganizes around them. Infrastructure without that discipline is expensive and underperforms. Infrastructure with it becomes a lasting economic advantage.

The sector has the evidence, the tools, and in most cases the intent to close the gap. What it needs is the discipline to turn that intent into something delivered.

Frequently asked questions

Why does committing capital to infrastructure not translate into delivered performance?

Because the three steps are further apart than they sound. Money committed to infrastructure is not the same as infrastructure delivered, and infrastructure delivered is not yet infrastructure that goes on performing year after year under load. The $94 trillion estimated investment need between 2016 and 2040 is well understood, but closing the gap will take more capital and better use of the capital already in motion. The sector has substantial room to improve on the second count, and the returns from doing so are large enough to change the economics of the whole program.

Why do most infrastructure organizations fail to claim the productivity that is already available?

Because the incentives work against the discipline that would capture it. Practical measures could reduce infrastructure spending by 40 percent, or roughly $1 trillion a year, through better project selection, tighter delivery, and getting more from what already exists. Few organizations operate this way, and the pattern recurs from one program to the next. Projects are chosen for visibility as much as for fit, front-end planning is compressed to meet a date, procurement leans toward the familiar over what performs, and once an asset is built, the discipline needed to keep it performing gives way to the next thing being built.

Where do the longest delays in transportation networks actually occur?

At the interfaces between modes. The 2023 Logistics Performance Index found that while most time is spent in shipping, the biggest delays happen at the seaports, airports, and multimodal facilities where one system hands off to another. That finding moves the problem. For a long time, the response to a transport bottleneck was to build more transport. The interface data points to coordination between modes and operators as the constraint, and coordination is not something that more concrete resolves.

Should new build be the default response to capacity pressure?

For most organizations, no. The highest return lies not in a new asset but in an existing one made to work better, and closing the performance gap on what is already in the ground tends to beat new construction on return, at lower risk and over a shorter period. The reason new build wins the contest for priority anyway is that it is visible, can be funded, and runs to a finish line. Asset optimization has none of those qualities. It is operational, draws little attention, and is never quite finished, which is why it loses the contest for priority even where it wins the contest on economics.

Why do digital tools so often fail to deliver the gains they promise in this sector?

Because they are treated as technology projects rather than as changes to the operating model. Digital investment pays off most clearly when it is tied to a particular operational outcome (a shorter dwell time at a port, maintenance scheduled by predictive analytics, freight routed on live network data), but the value comes from redesigning the work and the decision rights around better information, with the technology as the condition that makes it possible rather than the project itself. Organizations that treat these as changes to the operating model capture the return. Those that treat them as technology projects mostly do not.

Where should a transportation or infrastructure leadership team start when the priorities feel overwhelming?

Begin where the discipline produces the largest return at the lowest risk. Get more from existing networks before defaulting to new build, and invest in project selection and early-stage planning, because compressed front-end planning is among the most reliable predictors of cost overrun and schedule slip across the field. Some of the fastest gains come from clarifying who decides what, aligning processes across agencies, and measuring performance. Those improvements are often available all along, waiting behind a governance problem that no one has yet chosen to solve.

Sources

  1. Global Infrastructure Hub (G20 Initiative). (2017). Global Infrastructure Investment Need to Reach USD97 Trillion by 2040. London, UK: Global Infrastructure Hub.
  2. McKinsey Global Institute. (2013). Infrastructure Productivity: How to Save $1 Trillion a Year. New York, NY: McKinsey & Company.
  3. World Bank. (2023). World Bank Releases Logistics Performance Index 2023. Washington, DC: World Bank.
  4. International Transport Forum (ITF). (2023). ITF Transport Outlook 2023. Paris, France: OECD Publishing.
  5. UNCTAD. (2024). Navigating the Future: How AI, Big Data, and Autonomous Systems Are Reshaping Maritime Transport. Geneva, Switzerland: UNCTAD.

A 30-minute conversation to test whether the way your organization runs can deliver your plan.